LanganLogo  
 
     
        

RAIL SURVEYS

Sometimes the clearance window on a particular lane is so tight that a physical survey is required to ensure the load can be cleared. This requires physically running the route, measuring the tunnels and bridges, curvatures, and any obstructions and may include shipping a test car through the area in question. We have experience conducting rail surveys and we speak the same language as the railroads.

CA Bridge & Tunnel Survey - MCMProjects